Portfolio
The project consists of the implementation of a Vacuum Sewer System, composed of three main lines, branched by secondary lines and a Vacuum Station, in the parish of Arazede, municipality of Montemor-o-Velho.
The main objective is the collection and transport of wastewater produced in the area of influence of the aforementioned sewer network to the existing sewer network and, in turn, to the wastewater treatment plant that serves the Liceia, Gatões and Seixo network.
Construction Owner | ABMG – Águas do Baixo Mondego e Gandara. EIM, S. A.
Location | Coimbra
Type | Infrastructure
Area | 12.325,00 ml
Contract Value | 937.471,76 €
Project Year | 2016
Year of Construction | 2021-
Monitoring and Inspection of Construction Work
Safety Coordination / Environmental Compliance